Community Commitment

Responsible development, measured by what it costs you.

Amazon is committed to responsible development and being a long-term, positive presence in the Hobart community.

The questions residents ask most are about resources: water, power, noise and air. Each is answered below, and in more detail in the FAQ.

Water

Cooled by outside air 98% of the year

Amazon’s Hobart data center buildings will use approximately 14 million gallons of water per year for cooling — roughly equivalent to the water usage of 120 households. That total annual use can be produced in less than 12 hours by the water utility’s existing production facilities.

The campus relies on outside air cooling 98% of the year. On the hottest days — roughly 2% of the time — Amazon deploys water-based cooling technology that is 80% more efficient than the industry average, reducing demand on the power grid by 25% to 35% during peak summer months.

Water rates will not rise as a result. Amazon will pay all applicable fees and fund 100% of the water and sewer infrastructure needed for its operations, drawing water from Indiana American Water. Because the facilities use water for cooling only 2% of the year, that infrastructure is available to the utility the vast majority of the time — expanding Hobart’s water and wastewater systems at no cost to existing customers.

Water FAQ
Power

Paying its own way on the grid.

Amazon pays 100% of the costs associated with serving its Hobart campus, including all expenses for new energy infrastructure and upgrades — work that strengthens overall grid reliability for every NIPSCO customer.

Under the 2025 agreement with NIPSCO, Amazon pays fees to use existing power lines and covers the cost of any new power plants, lines or equipment needed to serve the project. Over 15 years, the agreement is expected to save NIPSCO electricity customers approximately $1 billion.

See the ratepayer study
Noise, Air and Oversight

Living next to it

  • Sound

    The campus will comply with all applicable sound regulations. Through design and construction, Amazon partners with acoustic engineers to keep sound levels low and ensure the facility fits comfortably within the surrounding community.

  • Backup generators

    All critical emergency generators are Tier 4 compliant, meeting the EPA’s highest emissions standards. They run an average of 10 hours per year, mostly brief tests, and all testing must meet local noise and permit requirements.

  • Environmental oversight

    Amazon works with regulatory agencies through planning, construction and operation to comply with environmental and public health standards, enforced through state and local permitting, ongoing monitoring and reporting, and regular inspections.

Read the full FAQ